The Allstate Corporation, Northbrook, Ill.

Allstate Insurance

CHALLENGE: Allstate Insurance faced several challenges when selecting air handling systems for its commercial office during a building renovation. First, access to the installation site was limited to a small access elevator, so it was not be possible to purchase a standard, preassembled air handling unit.
Read More. 


Hartford Hospital Emergency Room

Hartford Hospital Case Study

CHALLENGE: Air handling units at the Hartford Hospital Emergency Room served critical spaces in the facility, and they could not be down for more than a few hours. The challenge for Air Enterprises was to move more air for the hospital within the same footprint by improving ventilation, while also reducing facility downtime as much as possible.
Read More.


On site in Saudi Arabia

How Air Enterprises is providing air handling solutions for the King Abdulaziz Center for World Culture

Saudi Case Study Pic

The King Abdulaziz Center for World Culture is designed to take your breath away. Once completed in 2015, the sprawling complex in Dhahran, Saudi Arabia, will contain a document archive, library, learning center, art and history museum, and performing arts facility, among other features.
Read More.